Flatbed dispatch that checks your gear before it checks the rate
Load offer · 48 ft flatbed
Birmingham, AL Atlanta, GA
- RATE
- $650
- MILES
- 147+9
- ALL-IN RPM
- $4.17
- Freight: Steel coils, 44,000 lb
- Pickup: Mon 06:00 · Deliver: Mon 13:00
- Tarp pay $75
- TONU $150
Flatbed dispatcher first questions
The gear we ask about before the rate
A flatbed load you can't secure isn't a load, however well it pays. On the first call we write down exactly what you carry, and every load is checked against it before it reaches your phone.
Chains and binders
Grade, size and how many, for steel, coils, pipe and machinery.Straps
Count and working load limit, for lumber, building materials and lighter freight.Tarps
Lumber and steel tarps, and the drop sizes you have (commonly 4, 6 or 8 ft).Edge protection
Corner protectors that keep straps from cutting and freight from damage.Dunnage
Wood and blocking for coils, pipe and anything that can't sit straight on the deck.Deck and extras
Deck length, width and any coil racks, headache rack or side kits.
Securement calculator
How many tiedowns does this load need?
Pick a commodity or enter your own length and weight, then the working load limit printed on your strap or chain tag. The calculator applies the two federal minimums at once: the count by length, and the aggregate working load limit of at least half the cargo weight. Whichever is higher is the floor, and the diagram shows it on a 48 ft deck.
24 FT OF CARGO ON A 48 FT DECK5 TIEDOWNS
- Min by length
- 4
- 49 CFR 393.110
- Min by WLL
- 5
- aggregate WLL >= 21,000 lb
- You need at least
- 5
- WLL rule controls
- Aggregate WLL
- 25,000 lb
- with that many tiedowns
For one article with no front blocking. Blocked cargo, specific commodities (coils, logs, machinery and others) and state rules can require more. This is a planning aid, not a substitute for the regulations or your own inspection.
- The aggregate working load limit of all tiedowns must be at least half the cargo weight.
- Minimum tiedowns by length: one for articles 5 ft or shorter weighing 1,100 lb or less, two up to 10 ft, plus one for each additional 10 ft or part of it.
- Drivers inspect cargo securement within the first 50 miles, then at changes of duty status or every 3 hours or 150 miles, whichever comes first.
Source: FMCSA cargo securement rules, 49 CFR 393.110, October 2026
Tarp pay and accessorials
Tarping is work. It should pay like work.
Throwing tarps on a load of lumber takes time, effort and wears out expensive gear, and in wind or rain it can be dangerous. Too many flatbed loads get booked with tarps required and no tarp pay. We ask on every load and put the answer on the offer.
Tarp pay
A flat amount for tarping, sized to the job. If a broker won't pay it, you hear that before you decide.Detention at the mill or yard
Steel mills and lumber yards can make you wait. Detention terms go on the rate con before you accept.Layover
When a receiver can't unload until tomorrow, layover pay covers the night. We ask for it in writing.TONU
Truck ordered, not used: what you're owed when a load cancels after you've rolled. We push for it.
Flatbed dispatch service
Freight we find for flatbeds
Flatbed freight tracks construction, manufacturing and energy. Each group has its own securement, tarp and timing needs, and we tell you which before you accept.
Steel
Coils, plate, bar and beams from mills and service centers. Heavy, dense, chain work, often tarped.Lumber
Bunks from mills and yards to builders and retailers. Strap work, usually tarped, seasonal with construction.Building materials
Roofing, block, drywall and siding to job sites and stores. Mixed loads, tarps common.Pipe
Long, heavy and prone to shifting. Extra tiedowns and blocking, careful loading.Machinery
Equipment and parts that fit within legal height on a flat deck. Taller pieces go on a step deck.Energy and utility
Poles, transformers and components for utility and energy projects, often regional.
Flatbed rates
What moves a flatbed rate
Flatbed pay swings with construction and manufacturing, but on any given day these are the levers that decide whether a load is worth your time.
Tarps
Tarped loads take longer and wear gear. Tarp pay belongs on top of the linehaul, not inside it.Weight and density
A heavy coil load and a light building-material load can pay the same per mile but very differently per hour of work.Loading time
Crane-loaded steel at a busy mill can take hours. A quick forklift load at a yard can take minutes.Lane balance
Flatbed lanes out of manufacturing regions pay differently from lanes into them. The reload matters as much as the headhaul.Season
Building material loads rise and fall with the construction season, which pulls rates with them.Deadhead
Mills and yards aren't always near your last delivery. Empty miles count in every rate we show you.
Flatbed or step deck
When a flat deck wins, and when to drop down
Both are open decks. The difference is height. A step deck's lower deck sits closer to the ground, so taller freight fits under legal height limits. No federal height limit; state limits range from 13.6 to 14.6 ft, so the right trailer depends on the route too.
Flatbed
Best for steel, lumber, building materials and anything that loads from the side or with a forklift on a level deck. The most freight and the most brokers.
Step deck
Best for taller machinery and equipment that would be over height on a flatbed. Fewer loads, often better pay. See step deck dispatch.
Source: FHWA, October 2026
Before you roll
A flatbed load check before every pickup
Tap through the checks we run on the load details, so nothing about the freight surprises you at the shipper.
Flatbed load check
1/5 CHECKED
Weight, length, width and height against your deck and legal limits. Anything over 8.5 ft wide is oversize and needs a permit.
Whether tarps are required, what type and what drop, and whether tarp pay is on the offer.
Chains or straps, edge protection, dunnage, coil racks. Checked against what you carry.
Forklift, crane or overhead crane, and how long the shipper usually takes.
On the rate con before you accept, so waiting and cancellations pay.
Avoid these
Where flatbed owners lose money
Tarping for free
Accepting a tarped load with no tarp pay is giving away an hour of hard work. Ask every time.Short on tiedowns
One strap short can mean a roadside violation and an out-of-service order. Check the count before you leave the shipper.No photos of the secured load
Photos of the secured load protect you if a broker or receiver claims damage later.Waiting at mills with no detention
Mills and yards can make you wait for hours. Without terms on the rate con, the wait is unpaid.
Getting set up
What brokers check on a flatbed carrier
Flatbed brokers want to know you can secure their freight before they tender it. Having these answers ready speeds up every setup.
- Active authority and insurance with cargo coverage sized to the freight
- Deck length and width, and whether you have a spread axle
- Your chains, straps, binders and edge protection
- Tarp types and drop sizes, and whether you'll tarp
- Experience with steel, coils, lumber or machinery
- Photos of past secured loads, if the broker asks
We keep your gear list and photos on file with your carrier packet. When a steel broker asks whether you run coil racks or how many chains you carry, the answer goes out in minutes instead of a missed call while you're driving.
The flatbed year
Seasons that move flatbed freight
Flatbed freight follows construction. In many states, building and paving slow when it gets cold, and lumber and building material loads slow with them. Steel, pipe and machinery tend to move more steadily through the year.
We plan for the slow months before they arrive: shifting toward steel and manufacturing customers, or toward warmer regions where building keeps going. If you'd rather stay close to home, you'll know early what the winter looks like on your lanes so you can plan maintenance or time off instead of sitting.
Weather matters on the road too. Wind makes tarping dangerous, and rain or snow can hold up loading at open yards. When a pickup is delayed by weather, we tell the receiver early and look at how it changes the rest of your week, instead of leaving you to sort it out at the gate.
Your call, every load
How a flatbed load reaches you, and what it costs
Every load comes to you with the commodity, weight, dimensions, tarp and securement needs, times and pay. You say yes or no. On a yes, the broker emails the rate confirmation to you, and you check that tarp pay and every term is on it before you sign. The fee is 5% of gross for one truck with authority older than 6 months, 7% for newer authorities and 4% for fleets. EXAMPLE: a $7,000 week costs $350.
Read flatbed vs reefer, see oversize and heavy haul dispatch, check axle weights with the axle weight calculator, or compare fees on the pricing page.
Flatbed dispatcher: straight answers
Q01How much does flatbed dispatch cost?
Q02What securement gear do I need?
Q03Do you negotiate tarp pay?
Q04Do you dispatch step decks too?
Q05Is flatbed or reefer better for an owner-operator?
Q06Can a new MC get flatbed loads?
Q07Will you force me to take loads?
Your gear, your lanes, tarp pay on every offer.
Apply in about 2 minutes. Every load is your call.